INFRASTRUCTURE / RESIDENTIAL ROADING
Whaka Terrace Retaining Wall
Technically demanding retaining wall structure on steep hillside residential street
Location: Whaka Terrace, Christchurch
Client: Christchurch City Council
Designer: BECA
Contractor: Higgins
Expertise: ECI – Procurement and full construction management
Project Status: Complete
The Whaka Terrace project involved significant geotechnical, access, and safety challenges. The scope included soil nailing, shotcrete retaining systems, bored concrete piles, MSE wall construction, gabion basket structures, subsoil drainage, and full road reconstruction. Cadeo was engaged to provide early contractor involvement, procurement, and complete construction-phase project management.
Our Approach
Early contractor involvement
We were brought in while the design was still being developed. Our focus was on reviewing retaining wall options from a constructability perspective — assessing sequencing, methodology, and site-specific constraints before they became construction problems.
That early input helped align the engineering solution with what was actually achievable on the ground, reducing risk, improving efficiency, and ensuring the final design was buildable from day one.
Procurement and cost planning
We developed a first-principles estimate to establish a realistic project budget based on methodology, risk, and current market conditions. From there we engaged the market, assessed contractor capability and programme, and established a delivery strategy that balanced cost, quality, and risk.
Selecting experienced local contractors — people who knew the ground and the environment — was an important part of getting the outcome right.
Construction management
During construction, Cadeo provided full project management across a technically complex, multi-discipline scope. We maintained close oversight of contractor delivery, programme sequencing, cost control, and quality compliance — with regular client reporting throughout.
The 14-month programme required disciplined management of sequencing across earthworks, structural elements, drainage, and road reconstruction, with each stage dependent on the last.
Safety management
This was a high-risk project — work at height, confined space entry, and deep excavations in a live residential environment. A robust safety framework was in place from the start: permit-to-work systems, detailed construction methodologies developed during design, and ongoing hazard identification throughout delivery.
Safety leadership was active, not administrative. Controls were monitored and maintained on the ground, not just on paper.
Stakeholder and environmental management
Delivered over 14 months in a residential street, this project required sustained, proactive communication with residents. Traffic and access management was ongoing throughout, with works sequenced to minimise disruption to the surrounding community. Environmental controls were maintained across the full construction period.
Project Outcomes
Collaboration between client, designer, and contractor — supported by early involvement and disciplined construction management — delivered an outcome that held up at every stage.
Full compliance with Christchurch City Council requirements
Minimal defects at completion — only a minor snag list, resolved promptly
High-quality workmanship across all disciplines, including structural, geotechnical and civil
On-site client sign-off at practical completion
No significant safety incidents across a 14-month, high-risk construction programme
Community relationships maintained throughout an extended residential delivery